What belongs in a control cabinet handover?

Agree on components, configuration and delivery scope before ordering.

A project handover should identify the enclosure, configuration revision, component quantities, hardware documentation, approved drawings, software versions and delivered files. Distinguish the Combo's included items from on-site installation. Enclosure dimensions, power supply, loads, protection and installation conditions must be confirmed in the project's technical documentation. The website configuration table helps define product scope; it does not replace professionally reviewed installation drawings and instructions.